top of page

Sprague Energy Cannon Street Power Plant, New Bedford, MA

Project Value Range $4 – 5 million


Select Demo was contracted by a national engineering firm to perform the structural demolition, asbestos abatement, PCB remediation and hazardous material decontamination clean-up of this 255,000 SF power plant. Select’s scope also included the abatement of a six-story hung boiler. Select utilized a 250-ton crane with a dead man to further collapse a failing roof structure. The steel was left in place and Select built a new roof structure to contain the entire building. The collapsed roof was abated under a Massachusetts Department of Environmental Protection Nontraditional Work Plan.



Comments


A Premier Full Service Specialty Contracting Company

Main Headquarters

40 Lowell Road Salem, NH 03079

603-386-0391

Boston Office

11 Elkins Street Boston, MA 02127

617-882-7001

Milford Office

69 Eastern Steel Road, Milford, CT 06460

(475) 294-2877

Contact Us

Follow Us

Plymouth Office

34 Main Street Ext. Suite 401 Plymouth, MA 02360

603-386-0391

Email: contact@selectdemo.com

Phone: 603-386-0391

Fax: 603-458-7389

  • Facebook
  • Instagram
  • LinkedIn
Select.png

The Select Group is an Affirmative Action/Equal Opportunity Employer 

Select Demo is proud to be a part of the Select Group of Companies.

Select Demo Logo Square.png
SELECT PAINT AND FINISHES.png
Select Spray - Classic Revamp FLAT GOLD.png
Select-Tile_Final-Logo_Black.png
K-Town Disposal  White Out.png

© 2024 by Select Demo

Privacy Policy  |  Web Design by LetsDesignYourSite.com

bottom of page