Former Power Plant, 63 Water Street, Fall River, MA

Project Value: $900,000 - $1 million

Select Demo was retained to perform the complete demolition and asbestos abatement of this former 45MW coal-fired power plant that powered adjacent textile mills in the city of Fall River. Select’s demolition scope consisted of the complete takedown and abatement of a 40,000 SF brick and concrete structure down to top of the slab with slabs and foundation to remain. Select was responsible for abating and removing four (4) multi-story coal-fired boilers. The asbestos scope also consisted of the abatement, removal and disposal of smokestack breaching, steam line TSI, transite piping, woven electrical cloths, roof flashing, mag insulation and refractory breaching. This power plant was located only 25 feet from the shoreline of the east bank of the Taunton River. Directly below the building were a set of plant-owned train tracks in which Select erected one-inch steel plates on to set up a barrier system to catch any falling debris from entering the water.


コメント


A Premier Full Service Specialty Contracting Company

Main Headquarters

40 Lowell Road Salem, NH 03079

603-386-0391

Boston Office

11 Elkins Street Boston, MA 02127

617-882-7001

Milford Office

69 Eastern Steel Road, Milford, CT 06460

(475) 294-2877

Contact Us

Follow Us

Plymouth Office

34 Main Street Ext. Suite 401 Plymouth, MA 02360

603-386-0391

Email: contact@selectdemo.com

Phone: 603-386-0391

Fax: 603-458-7389

  • Facebook
  • Instagram
  • LinkedIn
Select.png

The Select Group is an Affirmative Action/Equal Opportunity Employer 

Select Demo is proud to be a part of the Select Group of Companies.

Select Demo Logo Square.png
SELECT PAINT AND FINISHES.png
Select Spray - Classic Revamp FLAT GOLD.png
Select-Tile_Final-Logo_Black.png
K-Town Disposal  White Out.png

© 2024 by Select Demo

Privacy Policy  |  Web Design by LetsDesignYourSite.com

bottom of page